(Girders plants معمل الروافد                                                                                        ( 

 

Steel Type

D

Bf

B

Bw

Span

Drawing

Precast

0.85

0.50

0.50

0.20

Up to 14m

drawing1 

Precast

1.56

1.43

0.80

0.21

Up to 24m

drawing1 

Prestress

0.85

0.50

0.50

0.2

Up to 20m

drawing1 

Prestress (Pedestrian Bridge)

0.85

0.50

0.50

0.2

24m

drawing1 

Prestress

1.20

0.40

0.97

0.16

24m

drawing1 

Prestress

1.36

0.40

0.97

0.16

Up to 29m

drawing1 

 

 

General Shape

 
   
الرئيسية   .   اتصل بنا   .      

Designed by foratweb.com